Projects
Our Projects

Executed ProjectsThe executed projects are the result of the cooperative works between ALMUMAIZ Various Personnel (engineers, assistants, technical laborers …). The following tables for executed projects are categorized as follows;1- Route Surveying.2- Topographical surveying.3- Hydrographical Surveying. In addition to that, the projects were selected in order to show the diversity of the surveying works carried out by ALMUMAIZ, That is to say that, the projects mentioned below represent a sample of the projects surveyed by ALMUMAIZ since its start in the year 2008.
Project Name Description of services Client Location Date Elseleim - Halfa Road Sector B Stake out of road alignment Zadna For Roads & Bridges Abosara - Abri North State - Sudan Mar. 2008 Setting out and measurement of details with reference to the oil pipe line of 5 Km in length Pioneer For Surveying And Engineering Consultants Khartoum Refinery - Khartoum State - Sudan Apr. 2008 Aroma-Wagar Water Pipe Line Study Surveying for water pipline from Atbara Nile to Aroma and Wager City (140 km ) Pioneer For Surveying And Engineering Consultants Aroma - Wagar -Kassala State - Sudan Apr. 2008 Detail Surveying and design for 11 km Pioneer For Surveying & Consultants Red Sea State - Sudan May. 2008 Detail Surveying and design for 40 km MAM for Roads & Bridges Blue Nile State - Sudan Dec. 2011 - Jan. 2012 6-Arab - Subag Husheib Road Detail Surveying for 143 km PDA & SMEC Algadaref State & Kasala State - Sudan Jan. 2012 - Nov. 2012
1- Route Surveying:Project Name Description of services Client Location Date Topographical survey for 70,000 feddans with soil analysis PECS Limited River Nile State - Sudan Feb. 2008 - March 2008 Madani Nuclear Medicine Hospital Construction setting out for the 5th floor Prova & Metash J.V. Algazeera State - Sudan March 2008 - may 2008 Digital Map For Nyala Town Digitizing the maps and designing them according to the cartographical specifications of the National survey Authority Free network Engineering Investment South Darfour State - Sudan April 2008. Setting out the water station location Biwater company Khartoum State - Sudan May 2008 - June 2008 Topographic map for 5,000 Feddans and Setting out of 109 Center pivots & canalization. With continuous surveying works required by the client. DAL Agricultural Services Company Ltd. Khartoum State - Sudan Aug. 2008 - Till Now Khartoum Refinery Map Details Surveying for Establishing a Canal EICO TEC. Khartoum State - Sudan Aug. 2008
2- Topographical Surveying :Elseleit Main Canal Details Surveying for Establishing a Canal Khartoum Survey Company Khartoum State - Sudan Sep. 2008 - Oct. 2008 Stake out of plots. With continuous surveying works required by the client. DC Investment Residential Khartoum State - Sudan Oct. 2008 - Till Now Establishing reference control point Ram Energy. South Kordofan State - Sudan Oct. 2008 As-built drawings plan, profile & x-sections for exist canal (70km) Mashkour Sugar Company White Nile State - Sudan May. 2009 -June 2009 Topographical survey for 750 feddans. Noples Group - Noples Modern System Khartoum State - Sudan Aug. 2009 - Oct. 2009 Topographical survey for 11,000 feddans and main canals integrity check (plan, profile & x-sections) DAL Agricultural Services Company Ltd. White Nile State - Sudan July 2010 -Aug. 2010 Topographical survey for 160,000 feddans, establishing & observation for 40 control points Kenana Sugar Company Ltd. (KSC), with consultant Kenana Engineering & Technical Services (KETS) White Nile State - Sudan July 2011 - Dec. 2011 Topographical survey for 20,000 hectares, establishing & observation for 8 control points and Longitudinal profile for proposed main canal (21 km) Kenana Sugar Company Ltd. (KSC), with consultant Kenana Engineering & Technical Services (KETS) District of Gorgel - Mauritania Dec. 2011 - Jan. 2012 Longitudinal profile for proposed main canal (35 km) from river to project junction Ministry of Agriculture Khartoum State - Sudan April 2012 - May 2012 Longitudinal profile for proposed main canal (17.4 km) with bathymetric survey in river YAM Consultancy & Development Co. Ltd. White Nile State - Sudan June . 2012 Topographical survey for 5,000 feddans, establishing & observation for 8 control points and Setting out for 10,000 palm trees locations. AL-HADDAD For Multi Activities Co. Ltd. Khartoum State - Sudan June. 2012 - Jan. 2013
3- Hydrographical Surveying :Project Name Description of services Client Location Duration Detailing Study with topographic survey for reservoir and longitudanal profile and x-sections for proposed dam axis and inlet channels Rakaiz For Construction Development Buildings South Kordofan State - Sudan June 2008 - July 2008 Demarcation of dam axis and borrow areas and establishing control points, Dam Implementation Unit (DIU) Sinar State - Sudan Aug. 2008 - Sep. 2008 Khor Shambat Surveying Detail surveying and drawing Abo Shora Co. Khartoum State - Sudan Oct. 2008 Collection of existing information, Distributing and fixing bench marks, surveying pertinent features, detail survey of the reservoir and spillway and inlet channels. UNPOS with Main Contractor ATBARA Construction Company North Darfur State - Sudan April 2010 - June 2010 Details Surveying for determining bridge centre line profiling and facilitating the bridge design. Yabi Markazi Co. Khartoum State - Sudan June 2010 - July 2010 Initial Study plan, profile and x-sections. With continuous surveying works required by the client ICG Co. Khartoum State - Sudan Jan. 2011 - Till now service to carry out a GPS survey to determine the profile (from inside river - bathymetry up to the suitable pumps station point); floor plan (position any nearby structure and civil work, canal head, pole and alignment); determine the profile of inlet and outlet canals and all related data for the 325 pumping points IRRIGER TECHNOLOGIA E SERVI?OS DE IRRIGA??O LTDA, River Nile State & White Nile State - Sudan Feb. 2011 - Aug. 2011 Detailing Study with topographic survey for reservoir and longitudanal profile and x-sections for proposed dam axis and inlet channels Dam Implementation Unit (DIU) Red Sea State - Sudan March - 2011


Executed Projects
The executed projects are the result of the cooperative works between ALMUMAIZ Various Personnel (engineers, assistants, technical laborers …). The following tables for executed projects are categorized as follows;
1- Route Surveying.
2- Topographical surveying.
3- Hydrographical Surveying.
In addition to that, the projects were selected in order to show the diversity of the surveying works carried out by ALMUMAIZ, That is to say that, the projects mentioned below represent a sample of the projects surveyed by ALMUMAIZ since its start in the year 2008.
Project Name | Description of services | Client | Location | Date |
Elseleim - Halfa Road Sector B | Stake out of road alignment | Zadna For Roads & Bridges | Abosara - Abri North State - Sudan | Mar. 2008 |
Setting out and measurement of details with reference to the oil pipe line of 5 Km in length | Pioneer For Surveying And Engineering Consultants | Khartoum Refinery - Khartoum State - Sudan | Apr. 2008 | |
Aroma-Wagar Water Pipe Line | Study Surveying for water pipline from Atbara Nile to Aroma and Wager City (140 km ) | Pioneer For Surveying And Engineering Consultants | Aroma - Wagar -Kassala State - Sudan | Apr. 2008 |
Detail Surveying and design for 11 km | Pioneer For Surveying & Consultants | Red Sea State - Sudan | May. 2008 | |
Detail Surveying and design for 40 km | MAM for Roads & Bridges | Blue Nile State - Sudan | Dec. 2011 - Jan. 2012 | |
6-Arab - Subag Husheib Road | Detail Surveying for 143 km | PDA & SMEC | Algadaref State & Kasala State - Sudan | Jan. 2012 - Nov. 2012 |
1- Route Surveying:
Project Name | Description of services | Client | Location | Date |
Topographical survey for 70,000 feddans with soil analysis | PECS Limited | River Nile State - Sudan | Feb. 2008 - March 2008 | |
Madani Nuclear Medicine Hospital | Construction setting out for the 5th floor | Prova & Metash J.V. | Algazeera State - Sudan | March 2008 - may 2008 |
Digital Map For Nyala Town | Digitizing the maps and designing them according to the cartographical specifications of the National survey Authority | Free network Engineering Investment | South Darfour State - Sudan | April 2008. |
Setting out the water station location | Biwater company | Khartoum State - Sudan | May 2008 - June 2008 | |
Topographic map for 5,000 Feddans and Setting out of 109 Center pivots & canalization. With continuous surveying works required by the client. | DAL Agricultural Services Company Ltd. | Khartoum State - Sudan | Aug. 2008 - Till Now | |
Khartoum Refinery Map | Details Surveying for Establishing a Canal | EICO TEC. | Khartoum State - Sudan | Aug. 2008 |
2- Topographical Surveying :
Elseleit Main Canal | Details Surveying for Establishing a Canal | Khartoum Survey Company | Khartoum State - Sudan | Sep. 2008 - Oct. 2008 |
Stake out of plots. With continuous surveying works required by the client. | DC Investment Residential | Khartoum State - Sudan | Oct. 2008 - Till Now | |
Establishing reference control point | Ram Energy. | South Kordofan State - Sudan | Oct. 2008 | |
As-built drawings plan, profile & x-sections for exist canal (70km) | Mashkour Sugar Company | White Nile State - Sudan | May. 2009 -June 2009 | |
Topographical survey for 750 feddans. | Noples Group - Noples Modern System | Khartoum State - Sudan | Aug. 2009 - Oct. 2009 | |
Topographical survey for 11,000 feddans and main canals integrity check (plan, profile & x-sections) | DAL Agricultural Services Company Ltd. | White Nile State - Sudan | July 2010 -Aug. 2010 | |
Topographical survey for 160,000 feddans, establishing & observation for 40 control points | Kenana Sugar Company Ltd. (KSC), with consultant Kenana Engineering & Technical Services (KETS) | White Nile State - Sudan | July 2011 - Dec. 2011 | |
Topographical survey for 20,000 hectares, establishing & observation for 8 control points and Longitudinal profile for proposed main canal (21 km) | Kenana Sugar Company Ltd. (KSC), with consultant Kenana Engineering & Technical Services (KETS) | District of Gorgel - Mauritania | Dec. 2011 - Jan. 2012 | |
Longitudinal profile for proposed main canal (35 km) from river to project junction | Ministry of Agriculture | Khartoum State - Sudan | April 2012 - May 2012 | |
Longitudinal profile for proposed main canal (17.4 km) with bathymetric survey in river | YAM Consultancy & Development Co. Ltd. | White Nile State - Sudan | June . 2012 | |
Topographical survey for 5,000 feddans, establishing & observation for 8 control points and Setting out for 10,000 palm trees locations. | AL-HADDAD For Multi Activities Co. Ltd. | Khartoum State - Sudan | June. 2012 - Jan. 2013 |
3- Hydrographical Surveying :
Project Name | Description of services | Client | Location | Duration |
Detailing Study with topographic survey for reservoir and longitudanal profile and x-sections for proposed dam axis and inlet channels | Rakaiz For Construction Development Buildings | South Kordofan State - Sudan | June 2008 - July 2008 | |
Demarcation of dam axis and borrow areas and establishing control points, | Dam Implementation Unit (DIU) | Sinar State - Sudan | Aug. 2008 - Sep. 2008 | |
Khor Shambat Surveying | Detail surveying and drawing | Abo Shora Co. | Khartoum State - Sudan | Oct. 2008 |
Collection of existing information, Distributing and fixing bench marks, surveying pertinent features, detail survey of the reservoir and spillway and inlet channels. | UNPOS with Main Contractor ATBARA Construction Company | North Darfur State - Sudan | April 2010 - June 2010 | |
Details Surveying for determining bridge centre line profiling and facilitating the bridge design. | Yabi Markazi Co. | Khartoum State - Sudan | June 2010 - July 2010 | |
Initial Study plan, profile and x-sections. With continuous surveying works required by the client | ICG Co. | Khartoum State - Sudan | Jan. 2011 - Till now | |
service to carry out a GPS survey to determine the profile (from inside river - bathymetry up to the suitable pumps station point); floor plan (position any nearby structure and civil work, canal head, pole and alignment); determine the profile of inlet and outlet canals and all related data for the 325 pumping points | IRRIGER TECHNOLOGIA E SERVI?OS DE IRRIGA??O LTDA, | River Nile State & White Nile State - Sudan | Feb. 2011 - Aug. 2011 | |
Detailing Study with topographic survey for reservoir and longitudanal profile and x-sections for proposed dam axis and inlet channels | Dam Implementation Unit (DIU) | Red Sea State - Sudan | March - 2011 |